Apolodor carried out civil works, foundations and roads for the farm’s 35 wind turbines. The work, which lasted almost 7 months, used a large amount of machinery (130-tonne crane, backhoe loaders, excavators, dump trucks, pile drilling rig) and a team of 200 employees.
Capacity: The farm has an installed capacity of 70 MW and was one of the major renewable energy projects developed by Enel Green Power in Dobrogea at that time.