After a week of preparation, “The Cross of the Century” was moved on Sunday, 6 February 2011, from Piața Charles de Gaulle to the roundabout at the intersection of Bd. Aviatorilor/Bd. Beijing.
The operation began at 7:20 and was completed at 9:18, with a team of over 60 people (engineers, special cutting workers, crane operators, drivers, carpenters). A 55-tonne Grove crane was used for lifting and a trailer for transport.







