Back to Portfolio

Dacia, Mioveni

Division Demolition
Location Mioveni, Argeș County
Services Demolition
Client Automobile Dacia SA
Period 2009

Dacia Mioveni
APOLODOR carried out the demolition by toppling of the Administrative Pavilion on the Mioveni platform on Saturday, 14 February 2009, at 15:00.
The building, with 10 levels (B + GF + 8 floors) and a footprint of 960 m², was only 3 metres away from the link building to the new administrative block. The old pavilion had to be demolished so that the neighbouring building (connected to electricity, water and gas networks, and fully operational) would not be affected.
Following the controlled implosion, which used 90 kg of explosives, the building tilted at 30º towards car park P3, so that, although they were very close, the link building and the new administrative headquarters were not affected at all.

A working sewer was located 2 metres from where the building fell, and it also remained intact after the pavilion hit the ground. All the material from the demolished building was collected in the 20 m wide pit dug before the implosion, surrounded by an earth embankment, which also served to stop the shock waves. No damage was reported (not a single broken window in the surrounding buildings), and the photographs show that even the lighting poles 2 m from the building remained untouched.