The project included demolition by implosion both on the exterior of the building and in its interior structure, mechanical demolition of the façade, earthworks and diamond cutting.
Special safety measures were taken, given the central location of the project.
For the heavily reinforced building, built during the communist regime, an impressive amount of explosives was used, together with meticulous preparation of the demolition.
The interior structures of the building were demolished without affecting the structure of the façades.
150,000 m³ of earthworks and 60,000 m³ of demolition volume.