The former IRA Grivița railway carriage repair factory was mechanically demolished in just 4 days.

The demolition and removal works were completed in January 2010 under conditions of maximum safety, without shocks, vibrations or massive elements falling from height. Water jets were used intensively throughout the works to greatly reduce the dust resulting from the demolition.
A very large excavator, the Liebherr R 954 with a 28 m long boom and a hydraulic demolition shear, was used for the demolition.